Chambers Prairie

  • Completed:

    • Playshed wall improvement
    • Parking lot clean and restripe
    • Wireless upgrades
    • Refinish wood beams
    • Roof vent repair and reinforcement
    • Tack strip installation
    • Climbing wall addition
    • Restroom flooring upgrade
    • Safety and Security
    • Tech upgrades
    • Roof clean, inspect and repair as needed
    • Siding clean, inspect and repair as needed
    • Play shed roof extension
    • Art Park development
    • Library casework improvements

    Upcoming:

    • Student park & garden (In review)

Lacey

  • Completed:

    • ADA door opener install
    • Center Hall Flooring Upgrade
    • Parking Lot clean, repair and restripe
    • Health and DD room floor covering replacement
    • Wall reconstruction at admin.
    • Sidewalk upgrade
    • Wireless technology upgrade
    • Roof clean, inspect and repair
    • Siding – clean, inspect, repair and repaint
    • Playground equipment upgrade

    Upcoming:

    • Check back

     

Lakes

  • Completed:

    • Parking lot clean, repair and restripe
    • Wireless tech upgrades
    • Demo old portable
    • Install new portable
    • ADA door installation
    • Covered walk repairs and improvements
    • Playground equipment upgrades
    • Gym floor refinish
    • Sewer line improvements
    • Stormwater system improvements
    • Door hardware upgrades - security

    Upcoming:

    • Check back



Meadows

  • Completed:

    • Wireless tech upgrades
    • Parking lot improvements – clean, repair and restripe
    • Two new double portables
    • Special Education playground upgrades
    • Early childhood improvements
    • Completed new Early Childhood building
    • Major stormwater system upgrades
    • Parking lot addition and upgrade
    • New intercom system
    • Fire alarm system upgrade
    • Septic system upgrades

    Upcoming:

    • Check back

     

Olympic View

  • Completed:

    • Entry security upgrades
    • Gym Floor Replacement
    • Parking Lot – clean, repair and restripe
    • Portables – misc. exterior painting
    • Removal of old stage
    • Portable entry ramp replacement
    • Technology wireless upgrades
    • Roof Replacement
    • Siding – clean, inspect, repair and repaint
    • Fencing and gates for security
    • Two storage sheds purchased and installed
    • New lunch tables
    • Gutter and downspout repairs
    • Door hardware upgrades - security
    • Irrigation upgrades

    Upcoming:

    • Check back



Seven Oaks

  • Completed:

    • Parking lot clean, repair and restripe
    • Wireless tech upgrades
    • Drinking fountain install
    • Early childhood safety upgrades
    • Acoustic panel in band area
    • Playground equipment upgrades - kindergarten
    • Gym acoustic panels
    • Old playground equipment removal and repaving
    • New lunch tables
    • Door hardware upgrades - security

    Upcoming:

    • Lighting to gym & parking lot (In review)
    • HVAC (In review)
    • Selective building exterior-roof, gutters and wall improvements
    • Select interior finish- walls & floors
    • Replace old portable classrooms (In review)

     

Woodland

  • Completed:

    • Wireless tech upgrades
    • Special education upgrades
    • Parking lot improvements – clean, repair, restripe
    • Storm water/drainage improvements
    • New vinyl flooring in Art room
    • New window in Admin.
    • Power outlets at front of stage
    • Security camera upgrades
    • Roof clean, inspect and repair as needed

    Upcoming:

    • Lighting & HVAC controls (In review)

     

Evergreen Forest

  • Completed:

    • New building entrance
    • New parking lot and traffic flow
    • New playshed – added classrooms in existing playshed
    • All building systems replaced and/or upgraded to current standards
    • Site – sewer, storm, water and other utility and playground upgrades
    • Portables demo’d and/or upgraded
    • Modular addition for phasing and growth
    • Plan for all day Kindergarten
    • Security upgrades
    • Technology upgrades

    Upcoming:

    • Check back

Lydia Hawk

  • Completed:

    • Parking lot improvements – clean, repair, restripe
    • Concrete sidewalk added
    • Wireless access upgraded
    • Asphalt walkway added
    • Stucco siding – clean, inspect, repair and refinish
    • Replace specified floor coverings
    • Gym building upgrades
      • Refinish wood floor
      • Repair and repaint siding

    Upcoming:

    • Play structure replacement

Horizons

  • Completed:

    • Door hardware upgrades
    • Playground equipment and play area
    • Wireless technology upgrade
    • Portable repairs and repainting
    • Floor covering in health room
    • Sidewalk improvements
    • Upgrade of playground equipment 
    • Acoustic treatment in gym
    • New lunch tables
    • Security Upgrades
    • Roof clean, inspect and repair
    • Siding – clean, inspect, repair and repaint, as needed
    • Select Interior finish upgrades
    • Replaced aging portable classrooms

    Upcoming:

    • Revise open classroom concept & add permanent walls (In review)
    • Technology Infrastructure Upgrades

Mountain View

  • Completed:

    • Partial Exterior Lighting upgrades
    • Parking lot clean, repair, restripe
    • Wireless tech upgrade
    • Roof Replacement
    • Food delivery sidewalk
    • Some additional new furniture was purchased
    • Acoustic treatment in band classroom
    • New Early Childhood building and playground
    • Playground equipment upgrade
    • Parking lot addition
    • Major stormwater system improvements
    • Fire alarm panel upgrade
    • Site & security uprgrades 
    • Building exterior - clean, repair, refinish
    • Repair and/or replace wall & floor finishes, including whiteboards

    Upcoming:

    • Site upgrades (in cooperation with City roundabout)
    • Grease Trap Replacement

Pleasant Glade

  • Current: 

    • Major Bond Funded Modernization (In process)
      • Site improvements; storm, parking and traffic, playground
      • Replacement of portables with a new 8 class modular
      • All building systems replaced or upgraded
      • New & improved security to building & site
      • New cafeteria and playshed

    Upcoming Schedule:

    • Completion Scheduled September 2019
    • Addition to Early Learning Center 2020

South Bay

  • Completed:

    • Parking lot improvements
    • Clean, repair and restripe
    • Drainage improvements
    • Wireless tech upgrades
    • Paint and re-carpet portables
    • Build new timeout room
    • Storm pond clean-up
    • Septic system assessment and upgrade
    • Door hardware system upgrade

    Upcoming:

    • Covered walk extension to 8-plex



Last Modified on January 15, 2019