North Thurston

  •  

    Current:

    • Major bond funded Modernization (In Process)
    • Additions for program improvements and growth
      • New Health and Fitness building
      • K-PAC addition – Band and Orchestra
    • Site Upgrades – storm, sewer, parking and traffic, landscaping
    • Building and site security improvements
    • Civil Rights Improvements
    • Technology Upgrades
    • Fast pitch field reconstruction
    • Street frontage improvements – Kasey Keller, Sleater-Kinney and 6th Ave
    • New sewer lift station
    • Increased student and staff parking
    • Eliminate all portable classrooms

    Upcoming:

    Summer/Fall 2019

    • New exterior campus courtyard
    • New bus loop
    • Removal of all portable classrooms
    • Road frontage improvements

River Ridge

  • Completed:

    • Security camera upgrade
    • Lighting upgrades
    • Parking lot clean, repair and restripe
    • Wireless technology upgrade
    • Civil rights/accessibility (OCR) upgrades
    • Portable paint and repair
    • Ballfield bleacher replacement
    • Misc. cabinetry upgrade
    • Water efficiency upgrade
    • STEM program remodeling
    • Pool, pool building and HVAC system upgrades
    • Track repair and restripe
    • Theater sound system upgrade
    • New door lock system
    • New classroom furniture
    • Equipment and furnishings from SPSCC
    • New gym floor covering
    • Building system upgrades
      • Building envelope upgrades - roof, siding windows
      • Interior finishes – misc. repairs, paint and floor coverings
      • HVAC Upgrade
      • Technology infrastructure
    • Theater – equipment upgrades as needed
    • Safety and Security upgrades
    • Tennis court repair and refinish
    • Additional counseling spaces needed
    • Reroof several portables
    • Technology infrastructure upgrade

    Upcoming:

    • New Auxiliary Gym- to include gym space and activity room (In Process)

South Sound

  • Completed:

    • Civil Rights (OCR) improvements
    • Wireless tech upgrades
    • Flooring change at kitchen
    • Drainage and storm water improvements
    • Misc. fencing
    • Parking lot clean and restripe

    Upcoming:

    Summer 2019

    • Construct new playshed

     

Timberline

  • Completed:

    • Electrical upgrades at new portables
    • Replaced furniture in the art room and portables
    • Repaired sidewalk and steps
    • Parking lot: Clean, repair, seal, restripe and addition of speedbumps
    • Wood column refinishing
    • Civil rights (OCR) improvements (Van signs, Auto Shop wash basin)
    • Improved access to football field
    • Tread repairs to gym stairways
    • Fence to seperate ball field from parking lot
    • Drainage upgrades to admin. 
    • Added lockers in gym
    • Art room display cabinets
    • Locker room floors (lower level) repaired and refinished
    • Special Ed. upgrades
    • Parking lot safety fence
    • Band room acoustic improvements
    • Exterior stairway upgrades
    • Door hardware upgrades
    • New portables and new paint on existing portables
    • Parking lot traffic improvements
    • Theater equipment

    Upcoming:

    • HVAC improvements in gym
    • Pool improvements 

     

     

     

     

Aspire

  • Completed:

    • Portable repairs and repainting
    • Skylight upgrades
    • Wireless technology upgrades
    • Parking lot improvements – clean, repair and restripe

    Upcoming:

    • Develop improved band, choir & orchestra spaces
    • Upgrade or replace portable classrooms
    • Aspire Middle School Sign on building

     

Chinook

  • Completed:

    • Added security cameras
    • AV additions to portables
    • Wireless technology upgrades
    • Parking lot clean, repair and restripe
    • Admin/counseling changes
    • Music/instrument storage improvements
    • Miscellaneous upgrades to portables
    • Portable classroom added
    • ADA parking ramps
    • Relocate electronic reader board
    • Select improvements to library, computer labs, building storage

    Upcoming:

    • Create covered play area outside, between gyms

Komachin

  • Completed:

    • Lighting upgrades
    • Gym roof and siding
    • Wireless tech upgrade
    • Portable paint - exteriors
    • Misc roof repairs
    • New greenhouse
    • Water conserving upgrades
    • Parking lot clean, repair, restripe
    • Reroof
    • Lock system upgrade
    • Exterior repairs and refinish
    • Gym floor refinish
    • Track restoration

    Upcoming:

    • Playshed improvements
    • Technology Infrastructure
    • HVAC system upgrades (In Review)

Nisqually

  • Completed:

    • Parking lot clean, repair and restripe
    • Paving additions in back of building
    • Wireless technology upgrade
    • Add new double portable classroom
    • Add storage cabinets in music area
    • Replace walk-in cooler in kitchen
    • Refinish playshed concrete
    • Miscellaneous fencing
    • Add time out room padding
    • Science/art portable added
    • Upgrade music portable – wall removal
    • Septic system testing and assessment
    • Door hardware upgrades - security
    • Track restoration

    Upcoming:

    • Check back

Salish

  • Project on time and within budget.

    • Building square footage 106,033 to accomodate 750 students.
    • Secure building access control.
    • Site design to separate bus and vehicle traffic.
    • Interior design to promote open sightlines for supervision.
    • Natural light thoughout design with lighting control systems.
    • Site and building CCTV security system. 